In construction and installation it is about working safely, building sustainably and a plan that takes risks off the buyer’s hands. Some of that is a hard requirement; some of it earns an award advantage.
What buyers ask for
- VCA at the right levelA VCA certificate shows that your company works safely and healthily. It is not required by law, but buyers in construction, installation and engineering often require it. VCA* focuses on your own operational risks; VCA** also covers managing subcontractors. The buyer decides which level is needed.
- The CO2 Performance LadderA contracting authority can use the CO2 Performance Ladder as an award criterion. Under the current guidance you choose one of three ambition levels when you bid and get a notional discount or points for it. During the contract you show that you meet the level. More in sustainability as an award criterion.
- Price and qualityIn the Dutch Public Procurement Act 2012, the most economically advantageous tender (EMVI) is the overall award criterion, and the best price-quality ratio is the standard. Your method statement and risk management are then worth money in the evaluation. Work out what a point is worth with the price and quality calculator.
- References that fitReferences often have to match the type and size of the work, within a set period. How to choose and describe the right ones: references.
In a private tender
With a private client, such as a developer or a company renovating a building, the relationship and the planning weigh heavily, and a negotiation round is common. Keep room in your price and cost out every commitment; read price and negotiation.
How Atvalio helps
Atvalio reads the documents, knows your company and helps you write. You decide and you submit. In this sector that looks like this:
- UnderstandSelection requirements such as VCA and references as knock-outs, and award criteria such as the CO2 Performance Ladder with their weighting, with the page.
- DecideA recommendation that sets your certificates, references and capacity against the requirements and the timeline.
- AskA question for the clarification round when a requirement seems disproportionate or the VCA level asked does not fit the role.
- WriteYour method statement and risk file per award criterion, from your own projects.
- CheckA simulated committee assesses your plan, and Atvalio checks format rules, annexes and declarations.
What often goes wrong
- Fictional exampleA certificate at the wrong levelAn installation company holds VCA*. The contract asks for VCA**, because the contractor manages subcontractors as main contractor. The difference is one line in the selection guide, and the bid is excluded. Atvalio sets every selection requirement against your profile and flags such a gap as a knock-out, with the page.
Read on
ATVALIO TENDERS
Atvalio Tenders is in development. On the waiting list, you can be the first to start a 14-day trial on a real tender.
Want Atvalio to do this for you?
Sources
Rules and certificates change. Always check what the documents of your tender say. Most sources are in Dutch.